Major Projects in Hydrocarbons:

Group Gathering Stations.

Gas Collection Module.

In-situ Combustion project.

Dehydrogenation Catalyst plant.

LPG Mounded Plant.

Amine Regeneration Unit.

NGL Facilities.

Turbo Expander Facility.

White Oil Marketing Terminal.

Napththa & Fuel oil Handling System.

C3/C4 Raffinate Loading/Unloading Facilities.

Fire Fighting And Safety Systems for Refineries.

Oil & Gas Installations and Petrochemicals.

Effulent Treatment PLants.

Cross Country Pipelines.

Multi Product Pipelines.

Coal Bed Methane (CBM) Project.

Major Irrigation Projects Executed:

HNSS Phase 1 lift irrigation Scheme Stage 1 & 2.

HNSS Phase 2 lift irrigation Scheme.

Kaleshwaram Lift Irrigation Scheme.

Manthani Lift Irrigation Scheme.

Indira Dummugudem Lift Irrigation Scheme package 21,22 & 31.

kadem Lift Irrigation Scheme.

Devadula Lift Irrigation Scheme -5 Packages.

PSO & Muthumarri Lift Irrigation Scheme.

Pranahitha-chevella Lift Irrigation Scheme pkg-5.

Dontivada-Sapu Lift Irrigation Scheme(3 Packages) in Gujrath State.

K.B.C Lift Irrigation For Packages PS2 & PS3 in Gujrath State.

Khargoan Lift Irrigation Scheme in Madhya Pradesh State.

Ghana Lift Irrigation Scheme in Rajasthan.

Our Comprehensive Water supply Projects:

Godavari Drinking Water supply scheme.

Hogenakkal Water supply and flurosis Mitigation project.

Comprehensive water supply scheme to Manchiryal Municipality.

Comprehensive water supply scheme to Nagari Municipality,AP.

Comprehensive water supply scheme to Bellampally Municipality,AP.

Comprehensive water supply scheme to Tenali Municipality,AP.

Comprehensive water supply scheme to Medanapalle Municipality,AP.

Comprehensive water supply scheme to Vinukonda Municipality,AP.

Comprehensive water supply scheme to Piduguralla Municipality,AP.

Comprehensive water supply scheme to Nellore Municipal Corporation,AP.

Rural Water Supply Scheme in Adilabad District.

Rural Water Supply Scheme in Prakasham District.

Rural Water Supply Scheme in INDRAMMA Housing colonies in AP.

Major Power Projects:

SSNNL (2*5MW) 3 Nos.(Feasibility Stage).

Dimphe Hydro Electric station.

Pacha (2*1.5MW)Hydro Electric Project.

Brindavan Tailrace(2*2.75 MW) Hydro Electric Project.

Rogalikhola (2*2.75 MW) Hydro Electric Project.

Koderma Power Plant,Kolkatta.

Energy Audit Study and recommendation for energy savings for Tirpur Water Supply Project.

Rashtriya Ispat Nigam Limited Vishakapatnam steel plant 6.3 MTPA Expansion Plant.

Solar Power Plant in Ananthapur.

Circulating Water System for Nuclear Power Corporation Limited.

132 KV substation.

220/11 KV substation.

33/6.6 KV Switchyard.

CW,ASW,Makeup water plant water package.

Balance of Plant.